AUD / CAD - Dual Grid Hedge cBot Backtesting


Dual Grid Hedge cBot Backtesting AUD / CAD

Dual Grid Hedge cBot does not use any specific time frame, so we can use any time frame. 
We did use in this examples 1h and 2h for chart display purposes only. 
Initial Equity 10,000 
Symbol AUD / CAD
Lots: 0.01 / Volume: 1k
Total Profit 100. It stops when is reaching 100
Step of the Grid: 50 pips
Take Profit when any open position is reaching 100
When an open position is reaching 100 and is closed, one Pending order is placed at the same opening price of the one just closed.
Tick Data - Accurate Data was used for the below backtesting
Note that all backtesting starts at the beginning of day 0:00 UTC

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader Tick Data 100 50 100 - 01

Parameters:

Symbol: AUD / CAD
Timeframe 1h and 2h (does not use any specific time frame, so we can use any time frame)
Lots / Volume: 0.01 / 1k
Total Profit: 100
Profit: 10
Step (pips): 50
Take Profit: 100
Label: DGH

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader Parameters 1k 100 50 100 - 01     Dual Grid Hedge AUD CAD 2h cAlgo cBots cTrader Parameters 1k 100 50 100 - 02



cAlgo cBots - Dual Grid Hedge cBot Backtesting AUD / CAD Example 1:

Starting date: first Monday of August 2015
Initial Equity: 10,000
Maximum Equity Drawdown: less than 50 from the Initial Equity

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader 1k 100 50 100 - 01




cAlgo cBots - Dual Grid Hedge cBot Backtesting AUD / CAD Example 2:

Starting date: first Monday of September 2015
Initial Equity: 10,000
Maximum Equity Drawdown: less than 50 from the Initial Equity

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader 1k 100 50 100 - 02




cAlgo cBots - Dual Grid Hedge cBot Backtesting AUD / CAD Example 2a:

Starting date: 1 September 2015
Initial Equity: 10,000
Maximum Equity Drawdown: less than 25 from the Initial Equity

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader 1k 100 50 100 - 02 a




cAlgo cBots - Dual Grid Hedge cBot Backtesting AUD / CAD Example 3:

Starting date: first Monday of October 2015
Initial Equity: 10,000
Maximum Equity Drawdown: less than 40 from the Initial Equity

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader 1k 100 50 100 - 03




cAlgo cBots - Dual Grid Hedge cBot Backtesting AUD / CAD Example 3a:

Starting date: 1 October 2015
Initial Equity: 10,000
Maximum Equity Drawdown: less than 20 from the Initial Equity

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader 1k 100 50 100 - 03 a




cAlgo cBots - Dual Grid Hedge cBot Backtesting AUD / CAD Example 4:

Starting date: first Monday of November 2015
Initial Equity: 10,000
Maximum Equity Drawdown: less than 400 from the Initial Equity

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader 1k 100 50 100 - 04




cAlgo cBots - Dual Grid Hedge cBot Backtesting AUD / CAD Example 5:

Starting date: first Monday of December 2015
Initial Equity: 10,000
Maximum Equity Drawdown: less than 50 from the Initial Equity

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader 1k 100 50 100 - 05




cAlgo cBots - Dual Grid Hedge cBot Backtesting AUD / CAD Example 5a:

Starting date: 1 December 2015
Initial Equity: 10,000
Maximum Equity Drawdown: less than 1000 from the Initial Equity

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader 1k 100 50 100 - 05 a




cAlgo cBots - Dual Grid Hedge cBot Backtesting AUD / CAD Example 6:

Starting date: first Monday of January 2016
Initial Equity: 10,000
Maximum Equity Drawdown: less than 40 from the Initial Equity

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader 1k 100 50 100 - 06




cAlgo cBots - Dual Grid Hedge cBot Backtesting AUD / CAD Example 7:

Starting date: first Monday of February 2016
Initial Equity: 10,000
Maximum Equity Drawdown: less than 20 from the Initial Equity

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader 1k 100 50 100 - 07




cAlgo cBots - Dual Grid Hedge cBot Backtesting AUD / CAD Example 8:

Starting date: first Monday of March 2016
Initial Equity: 10,000
Maximum Equity Drawdown: less than 100 from the Initial Equity

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader 1k 100 50 100 - 08




cAlgo cBots - Dual Grid Hedge cBot Backtesting AUD / CAD Example 8a:

Starting date: 1 March 2016
Initial Equity: 10,000
Maximum Equity Drawdown: less than 150 from the Initial Equity

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader 1k 100 50 100 - 08 a




cAlgo cBots - Dual Grid Hedge cBot Backtesting AUD / CAD Example 9:

Starting date: first Monday of April 2016
Initial Equity: 10,000
Maximum Equity Drawdown: less than 200 from the Initial Equity

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader 1k 100 50 100 - 09




cAlgo cBots - Dual Grid Hedge cBot Backtesting AUD / CAD Example 10:

Starting date: first Monday of May 2016
Initial Equity: 10,000
Maximum Equity Drawdown: less than 20 from the Initial Equity

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader 1k 100 50 100 - 10




cAlgo cBots - Dual Grid Hedge cBot Backtesting AUD / CAD Example 11:

Starting date: first Monday of June 2016
The Brexit / British exit is included in this beacktesting, see the chart
Initial Equity: 10,000
Maximum Equity Drawdown: less than 100 from the Initial Equity

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader 1k 100 50 100 - 11




cAlgo cBots - Dual Grid Hedge cBot Backtesting AUD / CAD Example 11a:

Starting date: Tuesday, the week when the Brexit was voted in UK - 21 June 2016
Initial Equity: 10,000
Maximum Equity Drawdown: less than 100 from the Initial Equity

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader 1k 100 50 100 - 11 a




cAlgo cBots - Dual Grid Hedge cBot Backtesting AUD / CAD Example 11b:

Starting date: Wednesday, the week when the Brexit was voted in UK - 22 June 2016
Initial Equity: 10,000
Maximum Equity Drawdown: less than 75 from the Initial Equity

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader 1k 100 50 100 - 11 b




cAlgo cBots - Dual Grid Hedge cBot Backtesting AUD / CAD Example 11c:

Starting date: Thursday, the week when the Brexit was voted in UK - 23 June 2016
Initial Equity: 10,000
Maximum Equity Drawdown: less than 100 from the Initial Equity

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader 1k 100 50 100 - 11 c




cAlgo cBots - Dual Grid Hedge cBot Backtesting AUD / CAD Example 12:

Starting date: first Monday of July 2016
The July 2016 is the next month after the Brexit / British exit
Initial Equity: 10,000
Maximum Equity Drawdown: less than 75 from the Initial Equity

Dual Grid Hedge AUD CAD 1h cAlgo cBots cTrader 1k 100 50 100 - 12












Currency Indices
Line Chart










http://icmarkets.com/?camp=5913


Currency Indices
Candlestick Chart












http://icmarkets.com/?camp=5913


Custom Currency 2 X MA Indicator



http://icmarkets.com/?camp=5913


Non US 
Currency Indices



http://icmarkets.com/?camp=5913


Utility  Z  cBots

Free  cBots  for cAlgo and cTrader



http://icmarkets.com/?camp=5913


Free Indicators